> Achievements > ADELIE SDIS 34 Hérault

Fire monitoring

 

installation of the adelie system in the hérault

Pic de Vissou: Installation of a high point for fire monitoring.

 

Within the framework of the surveillance of the forest massifs of the Hérault (La Gardiole, Gangeois, the hills of the centre of the Hérault...), installation of the ADELIE* system on the Pic de Vissou

by Olivier AUSSIGNARGUES of PARATRONIC and SOLAIRGO for the SDIS34.

 

Pooling of the energy source with this solar panel, which covers both the needs :

  • ADELIE early warning and detection cameras,
  • of the Hérault digital network.

 

*ADELIE system: Alert, Detection and Location of Fires.

 

The risk of forest fires is very high in the Hérault department, particularly during the heat wave.

 

Eric Flores, general controller and director of the SDIS 34: "We consider these fire risks by preparing ourselves. We are setting up our forest fire fighting system. We are going to have all of our land resources financed by the departmental council [...]. Overall, this system has been working well for two or three years. And the objective is to make it permanent.

Source : Midi Libre

 

The Hérault department has a complete system with watchtowers, cameras placed on the heights (including 13 cameras for the removal of doubt). "According to the department's services, 70% of the Hérault's territory is subject to fire surveillance, which represents an area of 3,780 km².

Source : Midi Libre

The product used

 

adelie light monitoring system

 

ADELIE System

 

The ADELIE (Alert Detection Localisation) system is a forest fire monitoring system that detects the presence of smoke in the natural environment thanks to a unique image capture and processing principle. 

 

Other achievements that could
interest you

 

SABI36 hydrological station on a bridge
A hydro station in Sainte-Sévère for SABI36

Installation of a hydrological station at the intersection of several tributaries of the Indre for SABI36 in Sainte-Sévère-sur-Indre: LNS, level sensor, camera for doubt removal, web supervisor.

ADELIE in the press: France 3 at SDIS 72

France 3 report: Implementation of the ADELIE system for monitoring forest fires in the Sarthe (72).

Water level measurement at the Bellejouanne plant

Installation of a water level measurement system in the Bellejouanne drinking water treatment plant.